Manuputty, Ranu Saputra Dewa, and Achmad Faiz Hadi Prajitno. “Project Acceleration Analysis Using the Time Cost Trade Off Method in the Phase II Construction of the Serayu Pegalongan – Mandirancan River Bridge, Banyumas Regency”. Jurnal Transportasi: Sistem, Material, dan Infrastruktur 5, no. 2 (July 18, 2023): A241 - A246. Accessed November 21, 2024. https://journal.its.ac.id/index.php/transportasi/article/view/729.