Saputri, Laili Dian, and Achmad Faiz Hadi Prajitno. “Time and Cost Estimation of Watu Sewu Bridge Construction on the South Cross Road LOT 7 Project Blitar”. Jurnal Transportasi: Sistem, Material, dan Infrastruktur 5, no. 2 (July 18, 2023): A247 - A253. Accessed December 21, 2024. https://journal.its.ac.id/index.php/transportasi/article/view/730.