• Navigasi Utama
  • Isi Utama
  • Bilah Samping
  • Daftar
  • Login
Jurnal Transportasi: Sistem, Material, dan Infrastruktur
  • Terkini
  • Arsip
  • Tentang Kami
    • Tentang Jurnal Ini
    • Penyerahan Naskah
    • Dewan Editor
    • Pernyataan Privasi
  1. Beranda
  2. Arsip
  3. Vol 5 No 2 (2022)

DOI: https://doi.org/10.12962//j26226847.v5i2

Diterbitkan: 2023-07-18

Articles

Feasibility Analysis of Yogyakarta-Bawen Tollway from Economic and Financial Aspect

Zulfan Akbar Abdillah, Anak Agung Gde Kartika

A227 - A233

PDF (English)

Geometric and Pavement Design of Probolingg – Banyuwangi Toll Road Section 1 (Probolinggo – Besuki)

Mochammad Irfan Arifandi, Cahya Buana , Istiar

A234 - A240

PDF (English)

Project Acceleration Analysis Using the Time Cost Trade Off Method in the Phase II Construction of the Serayu Pegalongan – Mandirancan River Bridge, Banyumas Regency

Ranu Saputra Dewa Manuputty, Achmad Faiz Hadi Prajitno

A241 - A246

PDF (English)

Time and Cost Estimation of Watu Sewu Bridge Construction on the South Cross Road LOT 7 Project Blitar

Laili Dian Saputri, Achmad Faiz Hadi Prajitno

A247 - A253

PDF (English)

Time Cost Trade Off (TCTO) Analysis by Considering Overtime Working Hours, and Labor Factors on the Outer East Ring Road (OERR) Surabaya Project (STA 0+000 – STA 5+875)

Nurul Isnaini, Achmad Faiz Hadi Prajitno

A254 - A260

PDF (English)

Bahasa

  • Bahasa Indonesia
  • English

Terbitan Terkini

  • Logo atom
  • Logo RSS2
  • Logo RSS1

Dikembangkan Oleh

Open Journal Systems

Google Scholar 

 

Informasi lengkap tentang sistem publikasi, Platform dan Alur Kerja oleh OJS/PKP.