Design of 100 MW LNG Floating Barge Power Plant

Authors

  • I Made Ariana Institut Teknologi Sepuluh Nopember
  • Hari Prastowo Institut Teknologi Sepuluh Nopember
  • Aldio Paruna Institut Teknologi Sepuluh Nopember

DOI:

https://doi.org/10.12962/j25481479.v1i3.6193

Keywords:

Diesel Engine, Fuel Gas, Fuel Oil, Gas Turbine, LNG, Mobile Power Plant

Abstract

Floating barge power plant able to supply amount of electricity to undeveloped island in Indonesia. In this research, the generator will be use in the power plant is dual-fuel engine. The process was determine the engine and every equipment along with its configuration then arrange the equipment. The result, MAN18V51/60DF selected along with its system configuration and its general arrangement. The final design enable 7.06 days of operation with daily average load (64.76 MW) or 4.57 days with continues 100 MW load. In the end, the mobile power plant can be built on Damen B32SPo9832 Barge and comply with the regulation.

Downloads

Download data is not yet available.

Downloads

Published

2025-07-10

How to Cite

Ariana, I. M., Prastowo, H., & Paruna, A. (2025). Design of 100 MW LNG Floating Barge Power Plant. nternational ournal of arine ngineering nnovation and esearch, 1(3), 120–127. https://doi.org/10.12962/j25481479.v1i3.6193

Issue

Section

Articles

Most read articles by the same author(s)

1 2 > >>