Manajemen Dan Rekayasa Lalu Lintas Simpang Menggunakan Simulasi PTV Vissim 9.0 (Studi Kasus: Dua Simpang Jln. Cak Doko Kecamatan Oebobo Kota Kupang)
Main Article Content
Abstract
Two adjacent intersections on Cak Doko Street, Oebobo District, Kupang City cause traffic jams, so an evaluation and ecommendations are needed based on the results of the Traffic Management and Engineering (MRLL) simulation. The analytical method used is intersection evaluation using the PTV Vissim 9.0 simulation programs and PKJI 2023. The results of the PTV Vissim 9.0 evaluation will be calibrated and validated as a basis for determining the traffic management and engineering recommendation. The intersection evaluation results for intersection delay values at intersections 1 and 2 are 15.392 sec/veh and 13.738 sec/veh (PKJI 2023) and 41.755 sec/veh and 28.379 sec/veh (PTV Vissim) while the respective LOS values are E and D. The most effective traffic menagement is recommendation 2, namely the installation of a median with a U-turn ban at both ends of the median, with the performance results for intersections 1 and 2 being LOS B with intersection delays of 11.497 sec/veh and 10.565 sec/veh, respectively.