Effect of Embankment Construction Pace on Slope Stability Wih Varied Heights on Organic Soft Soil in the Sicincin-Padang Toll Road Sta 10+250-10+400

Authors

  • Alfian Wildan Mulifandi Magister Student, Civil Engineering Department, Institut Teknologi Sepuluh Nopember, Surabaya
  • Trihanyndio Rendy Satrya Civil Engineering Departement, Institut Teknologi Sepuluh Nopember, Surabaya
  • Ria Asih Aryani Soemitro Civil Engineering Departement, Institut Teknologi Sepuluh Nopember, Surabaya, Indonesia.
  • Sri Hastuti Hardiningsih Project Director, Sicincin-Padang Toll Road Project, PT. Hutama Karya, Padang

Keywords:

Embankment stability, stage construction, settlement, organic soil, Plaxis 2D

Abstract

On the Sicincin-Padang toll road section there are several geotechnical problems, one of which is that at the Sta 10+250-10+400 is dominated by an organic soil. In the implementation of a 4.0 meter high embankment there are cracks appeared on the left side of embankment toe. Based on the evaluation results of monitoring geotechnical instruments in the field, the cracks that occur can be caused by the bearing capacity failure or due to the implementation stages of embankment construction is too fast. The method used in this research is to use finite element method by numerical simulation using Plaxis 2D program to determine the stability of embankment slope stability acording to the stages of implementation in the field and by modeling a staged construction, where the speed of embankment construction depends on the thickness of the embankment layer used, which is 15 cm to 25 cm until the design height is reached and the consolidation time is 1 day to 14 days for each additional 1 meter of embankment height. The porpose of this study is to determine the stages of implementation that are safe and compliant with the design criteria requrements.

From the modeling results the existing embankment construction in the field has a safety factor value of SF=1.156. In this research, variations in the construction stages that have been modeled were obtained that are safe and meet the design criteria at the location under review are; at Sta 10+250 with using 25 cm thickness fill layer and 14 days consolidation time, Sta 10+350 with a 15 cm thickness fill layer and 7 days consolidation time, Sta 10+400 with a 25 cm thickness fill layer and 5 days consolidation time. There are differences in the effective time at each of the locations reviewed, this is due to differences in geometric embankment conditions at each location. From the results of modeling analysis, it also found that by reducing the thickness of the embankment fill layer and increasing the consolidation time, the value of the safety number will increase, the amount of settlement will increase, the amount of lateral movement will decrease and the excess pore water pressure will decrease.

Downloads

Download data is not yet available.

Downloads

Published

2025-05-19

How to Cite

Wildan Mulifandi, A., Rendy Satrya, T., Aryani Soemitro, R. A., & Hastuti Hardiningsih, S. (2025). Effect of Embankment Construction Pace on Slope Stability Wih Varied Heights on Organic Soft Soil in the Sicincin-Padang Toll Road Sta 10+250-10+400. ournal of nfrastructure ∓ acility sset anagement, 6. etrieved from https://journal.its.ac.id/index.php/jifam/article/view/17-30