Cover

Main Article Content

Hitapriya Suprayitno

Abstract

Analysis of Temporary Preloading for Bridge Approach Embankment to Eliminate Secondary Compression
Case Study: Probolinggo – Banyuwangi Toll Road Construction Project Section 3 STA 40+550
Muhammad Rizal Permadi, Indrasurya B. Mochtar, Noor Endah Mochtar & Reza Kazhimi


The Effect of Prefabricated Vertical Drain Length on Soft Soil Settlement (Case Study: The North Ring Road of Lamongan STA. 3+200)
Henniko Okadha, Herman Wahyudi, Yudhi Lastiasih & Sifa' Udukha


Analysis of Excavated Soil Utilization as Embankment Material and Foundation Layer on Singaraja – Mengwitani Road Section (BALI)
Dinul Hadi, Ria Asih Aryani Soemitro, Trihanyndio Rendy Satrya & Noor Fachrie


Analysis of PVD Installation Methods Due to Limited Vertical Clearance in the Lamongan North Ring Road Construction Project Section 1 STA 0+400 to STA 0+426
Fanny Rumintha Br Barimbing, Yudhi Lastiasih, Herman Wahyudi & Sifa` Udukha


Determination of Building Assets and Equipment Requirements Based on Sustainable Warehouse Cencepts for PT Kansai Prakarsa Coatings
Putri Dewi Purnama & Halla Nur Azizah

Article Details

How to Cite
Suprayitno, H. (2025). Cover. Journal of Infrastructure & Facility Asset Management, 7. Retrieved from https://journal.its.ac.id/index.php/jifam/article/view/4453
Section
Cover