• Main Navigation
  • Main Content
  • Sidebar
  • Register
  • Login
Jurnal Transportasi: Sistem, Material, dan Infrastruktur
  • Current
  • Archives
  • About
    • About the Journal
    • Submissions
    • Editorial Team
    • Privacy Statement
  1. Home
  2. Archives
  3. Vol. 5 No. 2 (2022)

DOI: https://doi.org/10.12962//j26226847.v5i2

Published: 2023-07-18

Articles

Feasibility Analysis of Yogyakarta-Bawen Tollway from Economic and Financial Aspect

Zulfan Akbar Abdillah, Anak Agung Gde Kartika

A227 - A233

PDF

Geometric and Pavement Design of Probolingg – Banyuwangi Toll Road Section 1 (Probolinggo – Besuki)

Mochammad Irfan Arifandi, Cahya Buana , Istiar

A234 - A240

PDF

Project Acceleration Analysis Using the Time Cost Trade Off Method in the Phase II Construction of the Serayu Pegalongan – Mandirancan River Bridge, Banyumas Regency

Ranu Saputra Dewa Manuputty, Achmad Faiz Hadi Prajitno

A241 - A246

PDF

Time and Cost Estimation of Watu Sewu Bridge Construction on the South Cross Road LOT 7 Project Blitar

Laili Dian Saputri, Achmad Faiz Hadi Prajitno

A247 - A253

PDF

Time Cost Trade Off (TCTO) Analysis by Considering Overtime Working Hours, and Labor Factors on the Outer East Ring Road (OERR) Surabaya Project (STA 0+000 – STA 5+875)

Nurul Isnaini, Achmad Faiz Hadi Prajitno

A254 - A260

PDF

Information

  • For Readers
  • For Authors
  • For Librarians

Google Scholar 

 

More information about the publishing system, Platform and Workflow by OJS/PKP.