Using Max-Plus Algebra in The Flow Shop Scheduling

Main Article Content

Subiono
Nur Shofianah

Abstract

In this paper, it is discussed notion of maxplus algebra and their properties. A model of flow shop production system and analyze the dynamical behavior of the system for scheduling problems are derived by means of max-plus algebra. The solutions of these problems are that the optimal sequence of jobs and the regular scheduling are obtained.

Article Details

How to Cite
Subiono, & Shofianah, N. . (2025). Using Max-Plus Algebra in The Flow Shop Scheduling. IPTEK The Journal for Technology and Science, 20(3), 83–87. https://doi.org/10.12962/j20882033.v20i3.5879
Section
Articles